The following projects have been completed: Campus Pass, Visitor’s Pass, Validation of Visitor’s Pass and Document Tracking System for Change of Grades
The Human Capital Management (HCM) System is still ongoing
The Online Residency Form for Faculty is in the works.
The development of Generic Borrowing System (GBS) is ongoing.
The new MLS user interface has been applied to the Resources Reservation System.
The Computation of Rental Fees is a new feature that has been added to the Resources Reservation System.
The Approved Reservation Ticket is undergoing modifications for the improvement of its printout.
The Online Maintenance Request (SMR) Monitoring system is undergoing revisions on the following areas:
User access in menus
Manage User Access list of users and users type of acces
View Pending, Open and Closed Service Request listing of all requests
View Task Details calendar and query results
printing of SMR labels and displaying the requested by and requested for
Add Service Request and Request Service Manage Maintenance saving facility for organizations and individual users
Pilot testing for the Online faculty Evaluation System was conducted for selected freshmen Transformative Learning courses
The Scholarship and Financial Assistance Scholars & Donors Profile is ongoing
The Cost Estimation Model is still in the works.
The development of the User Access and Menu Systems Design is currently being processed.
The Restructuring of Department file is still ongoing.
A meeting was held to identify the schedule for deployment of the Prepaid System.
Technology Operations and Support Group (TOS)
The Help Desk manual is in the works.
The development of the Knowledge Base has already been started. It will be updated on a regular basis.
Deployment of Thin Client units for the Technology-Enabled Learning Enviornment (TELE) project is in progress:
Thin Client units have already been deployed to all classrooms inside the Andrew Gonzalez, Yuchengco, LS and Gokongwei Building (except G401).
Installation of Thin Client units is ongoing at the Velasco, SJ and Miguel bldg.
Applications are currently being installed in the remaining Thin Client units.
Evaluation of Altiris is ongoing.
Coordination with TIM is ongoing regarding the availability of IP addresses that will be used for managing projectors
The implementation of Help Desk Email Announcements guidelines is undergoing finalization.
Computer units are being prepared for The 2nd ASIAN Computational Materials Design (CMD) Workshop.
Technology Infrastructure Management Group (TIM)
The Wifi evaluation, management and deployment for the Technology-Enabled Learning Environment (TELE) project have been completed.
25 units of new printers have been deployed in the computer laboratories.
178/223 units of new computers for the following labs: G306, A1706, V211, GSB-RCBC, and Anook have already been deployed.
The deployment and configuration of APs have been completed.
The processing for the Purchase of equipment of the Technology-Enabled Learning Environment (TELE) has already started.
The re-harnessing of IDFs and Switch Deployment has been completed in most locations.
Bulletin boards, signages and tags in the laboratories have already been redesigned.
Broken chairs in the laboratories have already been replaced.
Old equipments have already been disposed to DLSP.
The re-harnessing and the installation of switches on IDF listings have been completed.
The cost for cabling renovations has already been estimated.
The VPN will be evaluated, tested, and given recommendations for its efficiency and security.
The group will implement, test and recommend a cost-effective Web-filtering solution.
MS SMS Server 2003 is currently being studied, tested and revived.
The master inventory file is being updated to have accurate count of PCs, printers and other computing devices and equipments.
Guidelines for MRF are being created.
The Management Software is undergoing installation and configuration.
Open IDFs/cabinets are currently being replaced.
The implementation of the Core Switch Redundancy is ongoing.
All Huawei S3050 edge switches have already been tested to check whether they are installed properly and if the fiber backbones are working.
Core switches are currently being configured and tested.
The Computer Laboratory Management web site, as well as its policies and procedures are currently being updated.
The evaluation for the Biometric System and CIS System is still ongoing
Computers in CCS and Velasco laboratories are currently being upgraded from 2GB to 4GB.
Printer tables and bag shelves are currently being fabricated.